Jobs Reference工程參考
Period |
Main Contractor: |
Project description |
Nature of work |
|
1 |
Jul 2020 - Aug 2020 |
China State Construction Eng.
Corp. |
C17W03 Sky Bridge (Air Authority
Hong Kong) |
Structural Steel Works for
Temporary |
|
|
( 相關工程照片 ) |
|
|
2 |
Jul 2019 - Jun 2020 |
Konwall Construction & Eng. Co. Ltd. |
Residential Re-Development at
No. 22A Kennedy Road |
ELS Works & Temporary
Working Platform |
|
|
( 相關工程照片 ) |
|
|
3 |
Nov 2018 - Mar 2019 |
Nishimatsu Const. Co. Ltd |
HY/2014/09 -Central Kowloon Route - Ho Man Tin Access
Shaft |
Construction of Muck Pit and
Ring Beam RB1 |
|
|
西松建設株式會社 |
( 相關工程照片 ) |
Rebar Fixing of Footing for
Noise Enclouse |
|
|
|
|
|
4 |
Nov 2018 - in progress |
Nishimatsu Const. Co. Ltd |
Contract No. SS
G503-Reprovisioning of Fu Shan Public Mortuary |
A. Site Clearance and Demolishing
Works |
|
|
西松建設株式會社 |
( 相關工程照片 ) |
B. Temporary Soil Platforms
Works |
|
|
|
|
C. Boulders Removal Works |
|
|
|
|
D. Temp. ELS, Soil Nail,
Shotcrete & etc. |
|
|
|
|
E. Foundation and Retaining Structure Works ( Concreting + Formworks) |
|
|
|
|
|
5 |
Apr 2017 - Dec 2018 |
Yau Lee Building Construction |
HKSH Eastern District Advanced
Medical Centre |
Design, Supply, Erect and
Demolition |
|
|
& Decoration Co. Ltd. |
( 相關工程照片 ) |
Basement Formwork Works |
|
|
|
|
|
6 |
Apr 2017 - Mar 2018 |
Gammon Construction Limited |
Tuen Mun - Chek Lap Kok Link Southern
Connection Viaduct Section - Contract No. HY/2012/07 |
Construction of Parapet with
Fascial Panel at Concreting + Formworks) |
|
|
|
( 相關工程照片 ) |
Viaduct C (C20 to C17) |
|
|
|
|
|
7 |
Nov. 2016 - Feb 2017 |
Vinci Construction Grands
Projects |
Admiralty South Overrun Tunnel -
Contract No. 1122 |
Slope, Drainage and Surface
Works at Hong Kong Park Ventilation Building |
|
|
|
( 相關工程照片 ) |
|
8 |
Aug. 2016 - Jan 2017 |
Gammon - Kaden Joint Venture |
Shatin to Central Link - Contract No.
1111 Hung Hom North Approach Tunnels |
A. Formwork Erection & Concrete
Placing for Winslow
Street Underpass Approach Ramp |
|
|
|
( 相關工程照片 ) |
B. Planter at West Wall NS4 & Strengthening Works for B25b at East
of Nosie Enclosure |
|
|
|
|
|
9 |
Feb 2014 - Aug. 2015 |
Leighton Contractors (Asia) Ltd. |
Shatin to Central Link - Contract
No. 1112 |
A. Supply Labour and Plant
(SC061) |
Mar 2015 - Nov 2016 |
Hung Hom Stations and Stabling
Sidings |
B. HUH & SAT ELS and Traffic Deck (SC074A) |
||
Aug 2015 - Nov 2016 |
( 相關工程照片 ) |
C. HUH Temporary Steelworks
(SC122) |
||
10 |
Apr 2013 - Oct 2013 |
Vinci Construction Grands
Projects |
Shatin to Central Link -
Contract No. 1103 |
A. Structural Steel Works for
Temporary |
Hing Keng to Diamond Hill
Tunnels |
Footbridge at Ma Chai Hang |
|||
May 2014 - Aug 2014 |
( 相關工程照片 ) |
B. Construction of Capping Beam
at Fung Tak |
||
Jul 2014 - Oct 2014 |
C. Construction of Capping Beam
at MCH |
|||
11 |
Apr 2012 - Mar. 2014 |
Leighton Contractors (Asia) Ltd. |
MTRC 903 -- South Island Line
(East) |
Supply Ganger and Rigger |
Ocean Park and Wong Chuk Hang
MTR Stations |
||||
12 |
Aug 2011 - Jul 2014 |
China State Construction Eng.
Corp. |
Central - Wan Chai Bypass Tunnel
(Causeway Bay Typhoon |
A. Excavation and Lateral
Support for Cut and |
Shelter Section) |
Cover Tunnel -- TPCWAE |
|||
Oct 2013 - Jul 2016 |
( 相關工程照片 ) |
B. Permanent Lining for Mined
Tunnel |
||
13 |
Jul 2011 - Mar 2012 |
Nishimatsu Const. Co. Ltd |
MTRC 1001 -- Kwun Tong Line
Extension |
A. Construction of Site Magazine
at TKO |
西松建設株式會社 |
Yau Ma Tei to Whampoa Tunnels
and Ho Man Tin Station |
Area 137 |
||
Sep 2011 - Jun 2013 |
( 相關工程照片 ) |
B. Construction of Noise
Enclosure at FKS, |
||
WAB & GAR |
||||
Jun 2013 - Aug 2015 |
C. Assembly of Tunnel Lining
Shutter |
|||
14 |
Jul 2011 - Dec 2011 |
Nishimatsu Const. Co. Ltd |
MTRC 902 -- South Island Line
(East) |
A. Provision of Labour and Plant |
Nov 2011 - Jan 2012 |
西松建設株式會社 |
Nam Fung Tunnel and Ventilation
Buildings |
B. Construction of Haul Road |
|
Jan 2012 - Oct 2015 |
( 相關工程照片 ) |
C. ELS & Earthworks to NFP
& HKB |
||
Dec 2013 - Apr 2016 |
D. Construction of Hong Kong
Park Ventilation |
|||
Building (Structural Works) |
||||
Jan. 2015 - Jan 2015 |
E. Dismantling Type 3 Shutter at
NFP |
|||
Nov 2015 - in progress |
F. Chain Link Fence, Concrete
Access and |
|||
Staircase on Slop at HKB |
||||
Dec 2015 - in progress |
G. ELS, Earthwork and Tie Back
Anchors for |
|||
LCSD Building at HKP |
||||
Apr 2016 - in progress |
H. Construction of LCSD Building
at Hong |
|||
Kong Park (Structural Works) |
||||
Mar 2016 - Jun 2016 |
I. Structural Works for Stud Tunnel |
|||
15 |
May 2010 - Apr. 2011 |
Gammon - Nishimatsu WIL Joint |
MTRC WIL Contract No. C704 - SYP
& HKU Stations and |
A. Construction of Soundproof
Enclosure at |
Venture |
SYP to KET Tunnel |
Praya Shaft |
||
Oct 2010 - Jul 2013 |
( 相關工程照片 ) |
B. Construction of Noise
Enclosure at Hill Road |
||
Apr 2011 - Apr. 2014 |
C. Supply of Tunnel Labour (Backup
Team) |
|||
Jul 2012 - Jul 2013 |
D. Main Structural Works of SYP
Station below |
|||
Concourse Slab Soffit |
||||
Apr 2013 - Mar 2014 |
E. Main Structural Works of SYP
Station above |
|||
Concourse Slab Soffit |
||||
16 |
Feb 2010 - Dec 2011 |
Leighton - China State - Van
Oord |
Central Reclamation Phase III -
Engineering Works |
Earthworks and Excavation
Lateral Supports |
Joint Venture |
for Tunnel Works |
|||
17 |
Sep 2009 - Dec 2009 |
Gammon Construction Limited |
Harbour Area Treatment Scheme Stage
2A - Construction of Sewage |
A. Demolition works of existing
R.C. structure |
Nov 2009 - Mar 2010 |
Conveyance System from North
Point to Stonecutters Island |
B. Construction of R.C. office
and firewall |
||
May 2010 - Nov 2015 |
C. Excavation & Disposal |
|||
18 |
Sep 2009 - Jun 2010 |
Gammon Construction Limited |
MTRC WIL Contract No. C708 -
Underground Magazine |
Earthworks, Soil Nails,
Retaining Walls, |
( 相關工程照片 ) |
Portal ELS & Traffic Steel
Deck |
|||
19 |
Aug 2009 - Apr 2010 |
China State Construction Eng.
Corp. |
The Foundation Works of Site
"C" at Wai Chai Road |
Cut and Weld of Pipe Pile and H
Pile |
20 |
Oct 2008 - May 2009 |
China State Construction Eng.
Corp. |
KDB 300 & 400 Tunnels - Yau
Ma Tei Vent Building To |
Reinstatement of Existing Box
Culvent |
Nam Cheong Overrun (九龍南環線) |
||||
21 |
Oct 2008 - Jun 2009 |
China State Construction Eng.
Corp. |
Proposed Residential Development
at 12 Broadwood Rd. |
Cut Off Shoring & Install of
Temporary Steel |
Frame |
||||
22 |
Sep 2008 - Nov 2008 |
China State Construction Eng.
Corp. |
Proposed Residential Development
at 6 Stanley Beach Rd. |
Steel hoarding, covered walkway
and concrete |
footing |
||||
23 |
Feb 2008 - Sep 2012 |
Dragages - Nishimatsu Joint
Venture |
Hong Kong West Drainage Tunnel |
Site Temporary and Consolidate
Works ; |
Structural work including
erection of |
||||
formwork, re-bar and concreting
work ; |
||||
Construction of Soundproof
Enclosure at EP; |
||||
Pipe pile & grouting works |
||||
24 |
Sep 2006 - Nov 2008 |
China State Construction Eng.
Corp. |
KDB 300 & 400 Tunnels - Yau
Ma Tei Vent Building To |
Temporary Structural Steelworks
Supporting |
Nam Cheong Overrun (九龍南環線) |
and Pre-loading |
|||
25 |
Aug 2006 - Sep 2008 |
ITD-NCC Joint Venture |
Nam Theun 2 Hydroelectric Project
(老撾水力發電) |
Tunnel Concrete Lining Works for
Headrace |
Tunnel, Surge Shaft, Pressure
Shaft |
||||
26 |
Jan 2006 - Sep 2008 |
China State Construction Eng.
Corp. |
KDB 300 & 400 Tunnels - Yau
Ma Tei Vent Building To |
Supply and Install of Temporary
Movable |
Nam Cheong Overrun (九龍南環線) |
Cofferdam at Cherry Street |
|||
27 |
Sep 2005 - Jan 2007 |
China State Construction Eng.
Corp. |
Proposed Comprehensive
Development at K.I.L 11158, |
A/C Platform Steel Frame and
Panel |
Hoi Fai Road, West Kowloon Reclamation,
Kowloon. |
||||
28 |
July 2005 - Sep 2005 |
China State Construction Eng.
Corp. |
Choi Wan Road Site 1 Phase 2 |
Steel hoarding, covered walkway
and concrete |
footing |
||||
29 |
July 2005 - Sep 2005 |
China State Construction Eng.
Corp. |
Choi Wan Road Site 1 Phase 1 |
Steel hoarding, covered walkway
and concrete |
footing |
||||
30 |
Mar 2005 - Sep 2005 |
China State Construction Eng.
Corp. |
Yew Chung Education Foundation
at Kowloon Tong |
Steel hoarding, covered walkway
and concrete |
footing |
||||
31 |
Jan 2005 - Jan 2007 |
China State Construction Eng.
Corp. |
Asia Airfreight Terminal -
Terminal Expansion |
Steel hoarding and covered
walkway, |
Structural Steel work |
||||
32 |
Sep 2004 - Aug 2005 |
W. Hing Construction Co. Ltd. |
Proposed Residential Development
at Wan Chai Road |
Green Area Work Include Common
Trench |
33 |
Aug 2004 - Apr 2009 |
Gammon-skanska International JV |
Route 8 - Nam Wan Tunnel |
Structural work including
erection of |
In-situ Concrete and Finishers
Works to Tunnel Cross Passages |
formwork, re-bar and concreting
work and |
|||
and Niches. |
finishes works |
|||
( 相關工程照片 ) |
||||
34 |
July 2004 - Oct 2006 |
China State Construction Eng.
Corp. |
Ho Tung Lau (Site A)
Development, Shatin, N.T. |
Structural Steel work |
Foundation and Railway Depot
Works |
||||
35 |
Apr 2004 - Sep 2004 |
Smart Champion Engineering Ltd. |
The Pile Caps, Columns and
Strengthening Works at Ground Level |
Steel hoarding and covered
walkway |
of Proposed Hotel Development at
663 - 635 King's Road, |
||||
North Point, H.K. |
||||
36 |
Mar 2004 - July 2004 |
China State Construction Eng.
Corp. |
Tsing Yi Hotels At TYTL 140, |
Structural Steel work |
Hotel Alternations and Additions
Works Main Contract |
||||
37 |
Sep 2003 - Feb 2004 |
China State Construction Eng.
Corp. |
Proposed Commercial/Service
Apartment at Yeung Uk Road |
Steel hoarding and covered
walkway, |
124 - 142 |
Welding work to temporary
supports |
|||
38 |
Sep 2003 - Jan 2005 |
China State Construction Eng.
Corp. |
Construction of the New
Headquarters for the Electrical and |
Structural Steel work |
Mechanical Services Department
at Kai Shing Street, Kai Tak. |
||||
39 |
May 2003 - Dec 2004 |
China State Construction Eng.
Corp. |
Hang Hau Station Development |
Steel hoarding and covered
walkway, |
at T.K.O.T.L. 24, Area 38b -
Tseung Kwan O. N.T. |
Welding work to temporary
supports |
|||
40 |
Oct 2002 to Jan 2003 |
China State Construction Eng.
Corp. |
Welding work to platform and hoarding
and etc |
Structural element welding work |
at Kowloon Inland Lot 11118,
King's Park |
||||
41 |
Dec 2001 - Aug 2004 |
Gammon-Nishimatsu Joint Venture |
Construction of subway under
tempoary decking |
Structural concrete works, |
including utility diversion,
traffic diversion |
erection of formwork and |
|||
excavation and temporary steel
decking. |
re-bar fixing |
|||
Middle Road Subway, Tsim Sha
Tsui , Kowloon. |
||||
42 |
Sept 2001 to Aug 2002 |
Nishimatsu Const. Co. Ltd |
MTRC 680 - North Point Station |
Structural work including
erection of |
西松建設株式會社 |
Vent shaft N vertical
substructure & TBM chamber structure |
formwork, re-bar and concreting
work |
||
43 |
July 2001 to June 2002 |
Nishimatsu Const. Co. Ltd |
West Rail Contract DB-350 |
Steel-work and related metal
work |
西松建設株式會社 |
Tai Lam Tunnel ( 大欖隧道 ) Cross-over Door
and Down Stand |
|||
44 |
Dec 2000 to July 2001 |
Nishimatsu Const. Co. Ltd |
MTRC 680 - North Point Station |
Structural work including
erection of |
西松建設株式會社 |
Substructure Vertical vent shaft
& TBM chamber structures |
formwork, re-bar and concreting
work |
||
45 |
Aug 2000 to Mar 2001 |
Nishimatsu Const. Co. Ltd |
MTRC 680 - North Point Station |
Welding H-beam support work |
西松建設株式會社 |
1 st & 2 nd Stage formation
& underpinning |
|||
Erection & welding of the
H-Beam supporting colum |
||||
46 |
July 1999 to May 2001 |
Nishimatsu Const. Co. Ltd |
MTRC 680 - North Point Station |
Concreting lining work including |
西松建設株式會社 |
Concrete lining for running and
turnback tunnel |
erection of formwork, re-bar and |
||
Concreting work @ New Plant
Building |
concreting work |
|||
47 |
Apr 1999 to June 1999 |
Nishimatsu Const. Co. Ltd |
MTRC 680 - North Point Station |
Tempoary work |
西松建設株式會社 |
Temp Diversion Stair for shaft & platform |
Welding work for staircace
diversion |
||
Erection of the welding works ( 燒焊工程 ) |
臨時工程-樓梯改道 |
|||
New plant Building ( 新機樓 ) |
||||
48 |
Nov 1998 to May 1999 |
Nishimatsu Const. Co. Ltd |
MTRC 680 - North Point Station |
Excavation and decking
installation |
西松建設株式會社 |
Soft Excavation and temporary
Steel Decking |
出泥及裝頂馬路面姥馱u程 |
||
New plant Building ( 新機樓 ) |
||||
49 |
July 1996 to Apr 1999 |
Nishimatsu Const. Co. Ltd |
Rount 3 Tam Lam Tunnel |
Structure concrete works ( 結構工程 ) |
西松建設株式會社 |
Tunnel works for Linning Construction |
Tunnel works for Linning
Construction |
||
大欖隧道3號幹線
Yuen Long (元朗 ) |
開挖隧道 |
|||
50 |
Jan 1996 to Mar 1997 |
Cross Kite Engineering Ltd |
Rennovation work inculding
clearance of site |
Rennovation work of building |
高越建築有限公司 |
Finishing and clearance work |
|||
25 Lok Sin Mansion, Ngau Tau
Kok, Kowloon. |
||||
51 |
Aug 1994 to May 1995 |
Cross Kite Engineering Ltd |
Building work for commercial and
domestic building |
Building work to comply BD's |
高越建築有限公司 |
8-10 Fuk Tsun Street, KIL 9883 , |
regulations |
||
Tai Kok Tsui , Kowloon. |
樓廠結構 |
|||
52 |
Jan 1994 to Jan 1995 |
Nishimatsu Const. Co. Ltd |
West Harbour Crossing |
Welding work |
西松建設株式會社 |
Welding work to Jordan Side
Portal |
|||
53 |
May 1993 to Feb 1994 |
Leung Shun Construction Co. Ltd |
Building work for commercial and
domestic building |
Building work to comply BD's |
良信建築有限公司 |
( excluding E & M works ) |
regulations |
||
271 Lockhart Road, Wanchai |
樓廠結構 |
|||
54 |
Nov 1992 to Feb 1993 |
Sanfield Lam JV Construction Co.
Ltd |
Installation Precast element
over Life Track |
Delivery of Precast element to
site via |
Lo Wu Main Line. |
Lok King Street. |
|||
( Overnight work including isolation and |
||||
possession of site at mid-night
) |
||||
55 |
Dec 1991 to Mar 1992 |
Y Tong International GmbH |
Construction of concrete tanking
for cement storage |
Structural work including
erection of |
Cement Company, Tai Tung, Yuen
Long |
formwork, re-bar and concreting
work |
|||
56 |
Mar 1991 to July 1993 |
Hong Kong Electricity Co. Ltd |
Concrete lining and cable laying
@ Cable Tunnel |
Structural work including
erection of |
Nam Fung Road to Parker Hill |
formwork, re-bar and concreting
work |
|||
57 |
Aug 1988 to Mar 1991 |
Nishimatsu Const. Co. Ltd |
Installation of precast concrete
ceiling slab |
Installation of precast concrete
slab |
|
西松建設株式會社 |
and plant repairing |
including erection of
scaffolding support |
|
Tai Lo Shan Tunnel |
||||
58 |
July 1986 to Sept 1988 |
Nishimatsu Const. Co. Ltd |
Steel structural work to provide
temporary support |
Welding work to temporary
supports |
|
西松建設株式會社 |
to Princess Road Flyover before
dismantling. |
||
59 |
May 1982 to Apr 1986 |
Nishimatsu Const. Co. Ltd |
Plant repairing |
Plant repairing |
|
西松建設株式會社 |
|||